Project Description
Do You Have A Project We Can Help With?
Jimah East Coal Fire Power Plant – TNB
To perform preheating, PWHT and hardness test work for 2 unit boiler and 2 unit turbine area with maximum thickness 148mm and critical material P91 and P92. This project use up to 40 unit of equipment and total work volume more than 60,000 dia inch with 100% fieldwork.
Project Details
DATE
Jun 2017 – Dec 2018
Client
Equator Engineering Sdn Bhd
Location
Port Dickson, Negeri Sembilan
Project Type
Post Weld Heat Treatment, Hardness Test for Boiler & Turbine.