To perform preheating, PWHT and hardness test work for 2 unit boiler and 2 unit turbine area with maximum thickness 148mm and critical material P91 and P92. This project use up to 40 unit of equipment and total work volume more than 60,000 dia inch with 100% fieldwork.

Project Details

DATE

Jun 2017 – Dec 2018

Client

Equator Engineering Sdn Bhd

Location

Port Dickson, Negeri Sembilan

Project Type

Post Weld Heat Treatment, Hardness Test for Boiler & Turbine.