Project NameWork VolumeClientOwner/LocationYear
SMDS PPING PWHT90,000 DB | 15,000 JTSJEMIX/ HYUNDAY/ JGCSHELL MDS1992
SMDS LNG TIE IN PIPING PWHT5,000 DBJEMIX/ TIAN SAN/ JGCSHELL MDS1992
TUB-01 PIPING PWHT700 DBMUSHTARIEPMI1992
SMDS MODIFICATION PIPING PWHT600 DBTIAN SAN/ JGCSHELL MDS1993
SHELL REFINERY SHUT DOWN
PIPING PWHT & PREHEAT
600 DBITISHELL REFINERY
DICKSON
1994
APS MODENIZATION PIPING
PWHT
1,100 DBWONG HENG ENG/
JGC
ESSO REFINERY
DICKSON
1994
STAR PETROLEUM REFINERY
PROJECT(THAILAND)
212,000 DB | 75,000 JTSJEMIX/ JGCSTAR PETROLEUM
REFINERY CO.
1996
HEATER COIL FOR OVERSEA
PROJECT
13,000 DB | 2,500 JTSSTEELCON SDN BHDBORN HEATER1997
TIONG A INFILL DRILLING
PIPING PWHT
700 DBVEROSI SDN BHDPCSB1997
PSR 2 MELAKA20,000 DBJEMIX/ CHIYODAPETRONAS REFINERY1998
MENTAKAB ABB POWER
STATION
20,000 DBSIKOJAYAABB POWER JANERATION1998
SHELL LRCC PORT DICKSON900 BENDS HFIB SPOOLJGCSHELL REFINERY
P.DICKSON
1998
ELP OP PLANT BRUNEI15,000 DB | 1,500 JTSSKS/ TECHNIP FAR
EAST
ELF ONSHORE
PRODUCTION PLANT
BRUNEI
1998
SHELL LRCC PORT DICKSONCHANGE ORDER 5,500 JTS
(SHOP)
JGCSHELL REFINERY PORT
DICKSON
1998
SHELL LRCC PORT DICKSONCHANGE ORDER 7,800 JTS
(FIELD)
JGCSHELL REFINERY PORT
DICKSON
1998
SHELL MDS RECONSTN
BINTULU
23,000 DIA INCHHARVEST ECH
SINBERY JV S/B
SHELL MDS BINTULU
SARAWAK
1999
SHELL MDS RECONSTN
BINTULU
5,500 DIA INCHPLANT ENGINEERING
CO (PEC)
SHELL MDS BINTULU
SARAWAK
1999
PETRONAS AMMONIA
SYNGAS
50,000 DIA INCHSUMATEC CO.PETRONAS KERTEH2000
OPTIMA MALAYSIA9,000 DIA INCHSUKWON INCHE SDN
BHD
OPTIMA MALAYSIA
KERTEH
2001
OPTIMA MALAYSIA4,500 DIA INCHSANDOH ENG.OPTIMA MALAYSIA
KERTEH
2001
OPTIMA MALAYSIA5,000 DIA INCHHL ENG. SDN BHDOPTIMA MALAYSIA
KERTEH
2001
MANJUNG POWER STATION X
700 MW
40,000 DIA INCHEVERSENDAINEIE
POWER SDN BHD
TNB2002
MLNG TIGA8,000 DIA INCHWONG HENG ENG.
SDN BHD
PETRONAS MLNG
BINTULU
2002
PANLIMA POWER STATION7,000 DIA INCHCTCI/ YONGHAN SDN BHDPOWERTECH MELAKA2002
PANLIMA POWER STATIONSUPPLY 6 TEAMSSUKWON IDCHE ENG.
SDN BHD
POWERTECH MELAKA2002
SMDS DEBOLTLE NECKING4,000 DIA INCHHAVESTECH ENGINEERING SDN
BHD
SMDS BINTULU2003
PSR2 SHUTDOWN4,000 DIA INCHWONG HENG
ENGINEERING SDN
BHD
MALAKA2003
TUAN JAAFAR POWER STATION20,000 DIA INCHEQAUTOR ENGINEERING
SDN BHD
PORT DICKSON2004
MULLUT BASINLOCALISED 100 NOS 10” TO 36” NOZZLE & MAIN HOLE FOR TANKWHESSOE SDN BHDPETRODAR/ SUDAN
AFRICA
2004
TANJUNG BIN 3 X 700 MW POWER STATION10,000 DIA INCHVANTAGE STEEL
WORKS SDN BHD
TANJUNG BIN, JOHOR2006
MULLUT BASINPIPING 4 TEAMSPEREMBA PECDPETRODAR/ SUDAN
ARFICA
2007
CTOC BROWN FIELDPIPING PWHT
6,000 DB
KENCANA HLLUMUT2007
CTOC BROWN FIELDPIPING PWHT
8,000 DB
MUSHTARI ENG. AND
TRADING
KEMAMAN TERENGGANU2007
CTOC BROWN FIELDOFFSHORE ERECTION
PWHT WORKS
2 TEAMS
MUSHTARI ENG. AND
TRADING
OFFSHORE KELANTAN2007
BCP-B2 (INDIA PROJECT)PWHT & PREHEATINGKENCANA HLLUMUT SITIAWAN
PERAK
2007
MAARI FIELD DEVELOPMENT
WELLHEAD PLATFORM
PROJECT
PREHEATING FOR HEAVY
STRUCTURE & PIPING
PWHT
15 TEMAS
KENCANA HLLUMUT SITIAWAN
PERAK
2008
HEERA REDEVPMENT
PROJECT
FURNACE PWHT FOR
TUBULAR
KENCAN HLLUMUT SITIAWAN
PERAK
2008
PP(MELAKA) SB MG3PIPING PWHT 70,000 DBKQKSMELAKA2008
METHANOL EXPENSIONPIPING PWHT 70,000 DBSHAMIRA/ DIALOG
E&C SDN BHD
LABUAN MALAYSIA2008
HEERA REDEVPMENT
PROJECT
PREHEATING & PWHT FOR
HEAVY STRUCTURE &
PIPNG PWHT
4 JACKET & 4 TOPSIDE
KENCANA HLLUMUT SITIAWAN
PERAK
2008
J4 PROJECTPREHEATING FOR HEAVY
STRUCTURE & PIPNG
PWHT
KENCANA HLLUMUT SITIAWAN
PERAK
2008
PP(MELAKA) SB PSR2
REVAMP
PIPING PWHT 25,000 DBWONG HENG
ENGINEERING SDN
BHD
MALAKA2009
MLNG 5&6 REVAMPPIPING PWHT 10,000 DBALMAGAMATED
PLANT ENGINEERING
S/B
BINTULU SARAWAK
MALAYSIA
2009
ASIA PETROLEUM HUBFURNACE PWHT FOR
SHELL PLATE WITH CLEAN
OUT DOOR
TORSCO OVERSEAS
SDN BHD */ KENCANA
INFLA
LUMUT SITIAWAN
PERAK
2009
BOKOR REDEVELOPMENT
PROJECT PHASE 2
PIPING PWHT SHOP AND
HOOK UP
VASTALUX SDN BHDMIRI OFFSHORE2009
PC-4 HUPHOOK UPTOTAL STERLING/
DAYANG
MIRI OFFSHORE2009
METHANOL 1 REVAMP
PROJECT
3 TEAMSDIALOG PLANT
SERVICE S/B
LABUAN W/P
MALAYSIA
2010
PSR 2 REVAMP PETRONAS
MELAKA
2 TO 4 TEAMSDIALOG E&C SDN
BHD
PETRONAS MELAKA
SUNGAI U DANG
2010
PSR 2 REVAMP PETRONAS
MELAKA
2 TO 4 TEAMSPFCE SDN BHD/
SHAMIRA SDN BHD
PETRONAS MELAKA
SUNGAI U DANG
2010
PSR2 TURN AROUND 2011PIPING AND VESSEL PWHT
30 TEAMS
DIALOG PLANT
SERVICE SDN BHD
PETRONAS MELAKA
SUNGAI U DANG
2011
ABF REVAMP PROJECT80” LINE X 10 JOINTSDIALOG E&C SDN
BHD
ABF BINTULU2011
SOGT KIMANIS25,000 DIA INCHEPIC MUSHTARI SDN
BHD
KIMANIS SABAH2012
KPOCPREHEATING & PWHT
WORK FOR 13 TONS
JACKET
KENCANA HLLUMUT YARD2012
E8K COMPRESSION MODULEPREHEATING PWHT FOR
TOPSIDE
KENCANA HLLUMUT YARD2012
F13K COMPRESSION
MODULE
PREHEATING & PWHT FOR
TOPSIDE
KENCANA HLLUMUT YARD2012
GARRAF FIELD DEVELOPMENTPWHT WORK FOR PIPINGKENCANA TORSCOLUMUT YARD2012
WEST DESARUMOPU
EXTENSION PROJECT
PREHEATING & POST HEAT
FOR LEG EXTRENSION
KENCANA HLLUMUT YARD2012
4TH DRIER BED PROJECTPWHT FOR PIPING (3000
DB)
KQKS SDN BHDMLNG BINTULU2012
CAMERON 22” BALL C
HEADER PIPE PROJECT
PREHEATING ON PIPE
LENGTH 16,642MM X 2 AT
THE SAME TIME PREHEAT
TORSCO/ CAMERONTORSCO YARD2013
MNB BOILER PROJECTPREHEATING AND PWHT
P11 ALLOY - 10,000 DIA
INCH
SNC/ MLNGMLNG BINTULU2014
FABRICATION OF STORAGE
TANKS IN PIT 101 & 103
FURNACE HEAT FOR TANK
PLATE X 126 PCS
EASTERN SOLDAR/
DIALOG
PENGARANG JOHOR
WORKSHOP
2014
DGDM PROJECTPWHT FOR PIPING(36”
PIPE 34MM THICK)
14,000 DB
AQEEL SDN BHDMLNG BINTULU2014
MANJUNG 4X100 COAL FIRE
POWER PLANT
PREHEATING & PWHT
10,000 DIA INCH
EESB/ TNBMANJUNG POWER
PLANT
2014
FABRICATION OF STORAGE
TANKS
FURNACE HEAT FOR TANK
SHELL PLATE X 106 PCS
CHINA CO./ DIALOGPENGARANG JOHOR2014
PDR M04-EPCC OF TWO
CRUDE & TWO BITUMEN
TANK PROJECT AT NEW
LAND
FURNACE HEAT FOR TANK
SHELL PLATE X 28 PCS
EASTERN SOLDAR
ENG. CONS. S/B
SEREMBAN NEGERI
SEMBILAN
2014
MARLIN PROJECTPWHT ON PIPINGPEC ENGINEERING
SND BHD
BINTULU SARAWAK2014
TRAIN 9 PRE-FABRICATION
ON PIPING PROJECT
PWHT 51,000 DIA INCH FEBDIALOG/ JGCBANTING SELANGOR2015
FMC-SHELL PRELUDE
WORKSHOP FABRICATION
PREHEATING WORKSFMC WELLHEAD
EQUIPMENT SDN BHD
KENCANA TORSCO
WORKSHOP
MANJUNG PERAK
2015
THE PROVISION OF EPCC FOR
ONSHORE SLUGCATCHER(OSC)
BLENDING FACILITIES OF
TGAST-OSC-GPPA(TOG) MODIFICATION
FOR PETRONAS CARIGALI
SDN BHD
PWHT & HARDNESS
TEST WORKS
KQKS ENG. & CONS.
SDN BHD
KERTEH TERENGGANU2015
TRAIN 9 SITE ELECTION
PWHT WORK ON PIPING
PWHT WORKS
(EST. 20,000 DIA INCH)
PEC ENGINEERING
SDN BHD
BINTULU SARAWAK2015
SAMUR PROJECTPWHT TEAM SUPPLYMITSUBISHI HEAVY
INDUSTRIES
PETRONAS2015
TURAROUND PSR 2PWHT TEAM SUPPLY
5 TEAMS
DIALOG PLANT
SERVICE SDN BHD
PETRONAS2016
NEW VESSELPWHTENCO SYSTEMS SDN
BHD
RAWANG2016
MANJUNG 5 COAL FIRE
1X1000MW
23,000 DIA INCH(FIELD
WORK)
PREHEATING & PWHT
EQUATOR ENF. SDN
BHD
TNB
MANJUNG
2016
TGAST PROJECTPWHT 31,000 DIA INCH
WORKSHOP & FIELD
EVERSENDAI OIL &
GAS SDN BHD
PETRONAS
TERENGGANU
2016
SHELL PLATE100 PCS FURNACE HEATICE PETROLEUM ENG.
SDN BHD
PETRONAS
PENGERANG JOHOR
2016
POST CURING AND
CLEANING
PWHTDIALOG PACIFIC
ADVANCE COMPOSITES
SDN BHD
NILAI NEGERI
SEMBILAN
2016
RAID TOYO 62” ABOVE PIPEPREHEATING & PWHT &
HARDNESS TEST
(EST. 18,000 DIA INCH)
DIALOG FABRICATION
SDN BHD
PETRONAS
PENGERANG JOHOR
2017
PCP PENGERANG COGENERATION
PLANT PROJECT
PWHT & PREHEATING &
HARDNESS TEST
(TURBINE)
IAQ SOLUTION SDN
BHD
PETRONAS
PENGERANG JOHOR
2018
PCP PENGERANG COGENERATION
PLANT PROJECT
PWHT & PREHEATING &
HARDNESS TEST
(EST. 31,000 DIA INCH BOILER)
EQUATOR ENGINEERING
SDN BHD
PETRONAS
PENGERANG JOHOR
2018
PROVISION OF EPCC DELTA
VALUE TUB AT DCU COKE
DRUM
PREHEATING & PWHTDIALOG PLANT
SERVIES SDN BHD
MELAKA2017
TERENGGANU GAS TERMINAL
PROJECT
49,929 DIA INCHEVERSENDAI OIL AND
GAS SDN BHD
KERTEH TERENGGANU2016
PLANT CHANGE WORKPREHEATING, PWHT &
HARDNESS TEST
KPG ENGINEERING
SDN BHD
MLNG
BINTULU
2017
RAPID PROJECT5,000 DIA INCH PWHT
& HARDNESS TEST
DIALOG FABRICATOR
SDN BHD
PENGARANG JOHOR2017
RAPID RGT-2 TERMINAL
PROJECT
PREHEATING &
PWHT
DIALOG FABRICATOR
SDN BHD
PENGARANG JOHOR2017
MRU PROJECTPWHTDIALOG FABRICATOR
SDN BHD
PENGARANG JOHOR2016
MANJUNG 5 POWER PLANTPREHEATING, PWHT &
HARDNESS TEST & POST
HEATING
EQUATOR ENGINEERING
SDN BHD
MANJUNG PERAK2016
PENGERANG 1220MW
COGENERATION PLANT
PROJECT
PWHT, PREHEATING &
HARDNESS TEST & POST
HEATING
EQUATOR ENGINEERING
SDN BHD
PENGARANG JOHOR2018
JIMAH EAST POWER PLANT
PROJECT
PREHEATING & PWHTEQUATOR ENGINEERING
SDN BHD
TANJONG SEPAT
NEGERI SEMBILAN
2018
TECHICAS REUNIDAS RAPID
PACKAGE
PWHT, HARDNESS TEST,
PREHEATING & POST
HEATING
EQUATOR ENGINEERING
SDN BHD
PENGARANG JOHOR2018
PENGARANG RAPID SCC
PROJECT
PWHT & PREHEATINGEQUATOR ENGINEERING
SDN BHD
PENGARANG JOHOR2018
PENGARANG JOHORPWHT, PREHEATING &
HARDNESS TEST &
CONTROLLED BOLTING
MHI ENERGY &
ENVIRONMENT (M)
SDN BHD
SIPITANG
SABAH
2017
PROVISION OF MAIN
MECHANICAL WORKS FOR
FSR-2 & MG3 TA2015/16 AT
PPMSB
PWHTPETRONAS
PENAPISAN MELAKA
MELAKA2018
RAPID PROJECT (ELECO)PREHEATING & PWHTKOSTEC NDT CONSULTANCY
SDN BHD
PENGARANG JOHOR2017
PENGARANG RAPID PROJECTPWHTKOSTEC NDT CONSULTANCY
SDN BHD
PENGARANG RAPID
PROJECT
2016
REPLACE 1” CAUSTIC LINEPWHTTOTAL DYNAMIC
ENGINEERING SDN
BHD
TOTAL DYNAMIC
PORT DICKSON
WORKSHOP
2016
PACKAGE 5 RAPID PROJECTPREHEATING & PWHTSINO PETROCHEMICAL
CONSTRUCTION
SDN BHD
PENGARANG JOHOR2018
PACKAGE 14 RAPID PROJECTPREHEATING, PWHT,
POST HEATING &
HADNESS TEST
CPP PETROLEUM
ENGINEERING (M)
SDN BHD
PENGARANG JOHOR2018
PETRONAS RAPID PROJECTPREHEATING & PWHTSINO TCC (M) SDN
BHD
PENGARANG JOHOR2017
PETRONAS RAPID PROJECTHARDNESS TESTSINO TCC (M) SDN
BHD
PENGARANG JOHOR2017
PETRONAS RAPID PROJECTPWHTSINO TCC (M) SDN
BHD
PENGARANG JOHOR2018
T9 GMSHYDRAULIC
CONTROLLED BOLTING
(TORQUE/TENSIONING)
JGC / SYNERLITZMLNG2015
TANK 7HYDRAULIC CONTROLLED
BOLTING (TORQUE)
TKM / BPMECHMLNG2017
PACKAGE 14JOINT INTEGRITY TEAM
/ HYDROTEST
OUI JVPETRONAS
PENGARANG JOHOR
2020
TRACK 4A 1440 MW CCGT
POWER PLANT
JOINT INTEGRITY TEAM
/ HYDROTEST
EQUATOR ENGINEERING
SDN BHD
SOUTHERN POWER
GENERATION
PENGARANG JOHOR
2020
SAMUR PROJECTHYDRAULIC CONTROLLED
BOLTING(TORQUE/TENSIONING),
HT, PWHT
MITSUBISHI HEAVY
INDUSTRIES LTD.
SABAH2019
TRAIN9 MRU PROJECTPWHTJGC (M) SDN BHDBINTULU2019
SMDS SHUTDOWNPREHEATING & PWHTPEC (M) SDN BHDBINTULU2019
MELAKA SHUTDOWNPREHEATING, PWHT,
POST HEATING &
HADNESS TEST
DIALOG PLANT SERVIES SDN BHDMELAKA2019
PSR-2 TURNAROUND PLANT
CHANGE PROJECT
PREHEATING, PWHT,
& HADNESS TEST
DIALOG PLANT
SERVIES SDN BHD
MELAKA2019