Project Name | Work Volume | Client | Owner/Location | Year |
---|---|---|---|---|
SMDS PPING PWHT | 90,000 DB | 15,000 JTS | JEMIX/ HYUNDAY/ JGC | SHELL MDS | 1992 |
SMDS LNG TIE IN PIPING PWHT | 5,000 DB | JEMIX/ TIAN SAN/ JGC | SHELL MDS | 1992 |
TUB-01 PIPING PWHT | 700 DB | MUSHTARI | EPMI | 1992 |
SMDS MODIFICATION PIPING PWHT | 600 DB | TIAN SAN/ JGC | SHELL MDS | 1993 |
SHELL REFINERY SHUT DOWN PIPING PWHT & PREHEAT | 600 DB | ITI | SHELL REFINERY DICKSON | 1994 |
APS MODENIZATION PIPING PWHT | 1,100 DB | WONG HENG ENG/ JGC | ESSO REFINERY DICKSON | 1994 |
STAR PETROLEUM REFINERY PROJECT(THAILAND) | 212,000 DB | 75,000 JTS | JEMIX/ JGC | STAR PETROLEUM REFINERY CO. | 1996 |
HEATER COIL FOR OVERSEA PROJECT | 13,000 DB | 2,500 JTS | STEELCON SDN BHD | BORN HEATER | 1997 |
TIONG A INFILL DRILLING PIPING PWHT | 700 DB | VEROSI SDN BHD | PCSB | 1997 |
PSR 2 MELAKA | 20,000 DB | JEMIX/ CHIYODA | PETRONAS REFINERY | 1998 |
MENTAKAB ABB POWER STATION | 20,000 DB | SIKOJAYA | ABB POWER JANERATION | 1998 |
SHELL LRCC PORT DICKSON | 900 BENDS HFIB SPOOL | JGC | SHELL REFINERY P.DICKSON | 1998 |
ELP OP PLANT BRUNEI | 15,000 DB | 1,500 JTS | SKS/ TECHNIP FAR EAST | ELF ONSHORE PRODUCTION PLANT BRUNEI | 1998 |
SHELL LRCC PORT DICKSON | CHANGE ORDER 5,500 JTS (SHOP) | JGC | SHELL REFINERY PORT DICKSON | 1998 |
SHELL LRCC PORT DICKSON | CHANGE ORDER 7,800 JTS (FIELD) | JGC | SHELL REFINERY PORT DICKSON | 1998 |
SHELL MDS RECONSTN BINTULU | 23,000 DIA INCH | HARVEST ECH SINBERY JV S/B | SHELL MDS BINTULU SARAWAK | 1999 |
SHELL MDS RECONSTN BINTULU | 5,500 DIA INCH | PLANT ENGINEERING CO (PEC) | SHELL MDS BINTULU SARAWAK | 1999 |
PETRONAS AMMONIA SYNGAS | 50,000 DIA INCH | SUMATEC CO. | PETRONAS KERTEH | 2000 |
OPTIMA MALAYSIA | 9,000 DIA INCH | SUKWON INCHE SDN BHD | OPTIMA MALAYSIA KERTEH | 2001 |
OPTIMA MALAYSIA | 4,500 DIA INCH | SANDOH ENG. | OPTIMA MALAYSIA KERTEH | 2001 |
OPTIMA MALAYSIA | 5,000 DIA INCH | HL ENG. SDN BHD | OPTIMA MALAYSIA KERTEH | 2001 |
MANJUNG POWER STATION X 700 MW | 40,000 DIA INCH | EVERSENDAINEIE POWER SDN BHD | TNB | 2002 |
MLNG TIGA | 8,000 DIA INCH | WONG HENG ENG. SDN BHD | PETRONAS MLNG BINTULU | 2002 |
PANLIMA POWER STATION | 7,000 DIA INCH | CTCI/ YONGHAN SDN BHD | POWERTECH MELAKA | 2002 |
PANLIMA POWER STATION | SUPPLY 6 TEAMS | SUKWON IDCHE ENG. SDN BHD | POWERTECH MELAKA | 2002 |
SMDS DEBOLTLE NECKING | 4,000 DIA INCH | HAVESTECH ENGINEERING SDN BHD | SMDS BINTULU | 2003 |
PSR2 SHUTDOWN | 4,000 DIA INCH | WONG HENG ENGINEERING SDN BHD | MALAKA | 2003 |
TUAN JAAFAR POWER STATION | 20,000 DIA INCH | EQAUTOR ENGINEERING SDN BHD | PORT DICKSON | 2004 |
MULLUT BASIN | LOCALISED 100 NOS 10” TO 36” NOZZLE & MAIN HOLE FOR TANK | WHESSOE SDN BHD | PETRODAR/ SUDAN AFRICA | 2004 |
TANJUNG BIN 3 X 700 MW POWER STATION | 10,000 DIA INCH | VANTAGE STEEL WORKS SDN BHD | TANJUNG BIN, JOHOR | 2006 |
MULLUT BASIN | PIPING 4 TEAMS | PEREMBA PECD | PETRODAR/ SUDAN ARFICA | 2007 |
CTOC BROWN FIELD | PIPING PWHT 6,000 DB | KENCANA HL | LUMUT | 2007 |
CTOC BROWN FIELD | PIPING PWHT 8,000 DB | MUSHTARI ENG. AND TRADING | KEMAMAN TERENGGANU | 2007 |
CTOC BROWN FIELD | OFFSHORE ERECTION PWHT WORKS 2 TEAMS | MUSHTARI ENG. AND TRADING | OFFSHORE KELANTAN | 2007 |
BCP-B2 (INDIA PROJECT) | PWHT & PREHEATING | KENCANA HL | LUMUT SITIAWAN PERAK | 2007 |
MAARI FIELD DEVELOPMENT WELLHEAD PLATFORM PROJECT | PREHEATING FOR HEAVY STRUCTURE & PIPING PWHT 15 TEMAS | KENCANA HL | LUMUT SITIAWAN PERAK | 2008 |
HEERA REDEVPMENT PROJECT | FURNACE PWHT FOR TUBULAR | KENCAN HL | LUMUT SITIAWAN PERAK | 2008 |
PP(MELAKA) SB MG3 | PIPING PWHT 70,000 DB | KQKS | MELAKA | 2008 |
METHANOL EXPENSION | PIPING PWHT 70,000 DB | SHAMIRA/ DIALOG E&C SDN BHD | LABUAN MALAYSIA | 2008 |
HEERA REDEVPMENT PROJECT | PREHEATING & PWHT FOR HEAVY STRUCTURE & PIPNG PWHT 4 JACKET & 4 TOPSIDE | KENCANA HL | LUMUT SITIAWAN PERAK | 2008 |
J4 PROJECT | PREHEATING FOR HEAVY STRUCTURE & PIPNG PWHT | KENCANA HL | LUMUT SITIAWAN PERAK | 2008 |
PP(MELAKA) SB PSR2 REVAMP | PIPING PWHT 25,000 DB | WONG HENG ENGINEERING SDN BHD | MALAKA | 2009 |
MLNG 5&6 REVAMP | PIPING PWHT 10,000 DB | ALMAGAMATED PLANT ENGINEERING S/B | BINTULU SARAWAK MALAYSIA | 2009 |
ASIA PETROLEUM HUB | FURNACE PWHT FOR SHELL PLATE WITH CLEAN OUT DOOR | TORSCO OVERSEAS SDN BHD */ KENCANA INFLA | LUMUT SITIAWAN PERAK | 2009 |
BOKOR REDEVELOPMENT PROJECT PHASE 2 | PIPING PWHT SHOP AND HOOK UP | VASTALUX SDN BHD | MIRI OFFSHORE | 2009 |
PC-4 HUP | HOOK UP | TOTAL STERLING/ DAYANG | MIRI OFFSHORE | 2009 |
METHANOL 1 REVAMP PROJECT | 3 TEAMS | DIALOG PLANT SERVICE S/B | LABUAN W/P MALAYSIA | 2010 |
PSR 2 REVAMP PETRONAS MELAKA | 2 TO 4 TEAMS | DIALOG E&C SDN BHD | PETRONAS MELAKA SUNGAI U DANG | 2010 |
PSR 2 REVAMP PETRONAS MELAKA | 2 TO 4 TEAMS | PFCE SDN BHD/ SHAMIRA SDN BHD | PETRONAS MELAKA SUNGAI U DANG | 2010 |
PSR2 TURN AROUND 2011 | PIPING AND VESSEL PWHT 30 TEAMS | DIALOG PLANT SERVICE SDN BHD | PETRONAS MELAKA SUNGAI U DANG | 2011 |
ABF REVAMP PROJECT | 80” LINE X 10 JOINTS | DIALOG E&C SDN BHD | ABF BINTULU | 2011 |
SOGT KIMANIS | 25,000 DIA INCH | EPIC MUSHTARI SDN BHD | KIMANIS SABAH | 2012 |
KPOC | PREHEATING & PWHT WORK FOR 13 TONS JACKET | KENCANA HL | LUMUT YARD | 2012 |
E8K COMPRESSION MODULE | PREHEATING PWHT FOR TOPSIDE | KENCANA HL | LUMUT YARD | 2012 |
F13K COMPRESSION MODULE | PREHEATING & PWHT FOR TOPSIDE | KENCANA HL | LUMUT YARD | 2012 |
GARRAF FIELD DEVELOPMENT | PWHT WORK FOR PIPING | KENCANA TORSCO | LUMUT YARD | 2012 |
WEST DESARUMOPU EXTENSION PROJECT | PREHEATING & POST HEAT FOR LEG EXTRENSION | KENCANA HL | LUMUT YARD | 2012 |
4TH DRIER BED PROJECT | PWHT FOR PIPING (3000 DB) | KQKS SDN BHD | MLNG BINTULU | 2012 |
CAMERON 22” BALL C HEADER PIPE PROJECT | PREHEATING ON PIPE LENGTH 16,642MM X 2 AT THE SAME TIME PREHEAT | TORSCO/ CAMERON | TORSCO YARD | 2013 |
MNB BOILER PROJECT | PREHEATING AND PWHT P11 ALLOY - 10,000 DIA INCH | SNC/ MLNG | MLNG BINTULU | 2014 |
FABRICATION OF STORAGE TANKS IN PIT 101 & 103 | FURNACE HEAT FOR TANK PLATE X 126 PCS | EASTERN SOLDAR/ DIALOG | PENGARANG JOHOR WORKSHOP | 2014 |
DGDM PROJECT | PWHT FOR PIPING(36” PIPE 34MM THICK) 14,000 DB | AQEEL SDN BHD | MLNG BINTULU | 2014 |
MANJUNG 4X100 COAL FIRE POWER PLANT | PREHEATING & PWHT 10,000 DIA INCH | EESB/ TNB | MANJUNG POWER PLANT | 2014 |
FABRICATION OF STORAGE TANKS | FURNACE HEAT FOR TANK SHELL PLATE X 106 PCS | CHINA CO./ DIALOG | PENGARANG JOHOR | 2014 |
PDR M04-EPCC OF TWO CRUDE & TWO BITUMEN TANK PROJECT AT NEW LAND | FURNACE HEAT FOR TANK SHELL PLATE X 28 PCS | EASTERN SOLDAR ENG. CONS. S/B | SEREMBAN NEGERI SEMBILAN | 2014 |
MARLIN PROJECT | PWHT ON PIPING | PEC ENGINEERING SND BHD | BINTULU SARAWAK | 2014 |
TRAIN 9 PRE-FABRICATION ON PIPING PROJECT | PWHT 51,000 DIA INCH FEB | DIALOG/ JGC | BANTING SELANGOR | 2015 |
FMC-SHELL PRELUDE WORKSHOP FABRICATION | PREHEATING WORKS | FMC WELLHEAD EQUIPMENT SDN BHD | KENCANA TORSCO WORKSHOP MANJUNG PERAK | 2015 |
THE PROVISION OF EPCC FOR ONSHORE SLUGCATCHER(OSC) BLENDING FACILITIES OF TGAST-OSC-GPPA(TOG) MODIFICATION FOR PETRONAS CARIGALI SDN BHD | PWHT & HARDNESS TEST WORKS | KQKS ENG. & CONS. SDN BHD | KERTEH TERENGGANU | 2015 |
TRAIN 9 SITE ELECTION PWHT WORK ON PIPING | PWHT WORKS (EST. 20,000 DIA INCH) | PEC ENGINEERING SDN BHD | BINTULU SARAWAK | 2015 |
SAMUR PROJECT | PWHT TEAM SUPPLY | MITSUBISHI HEAVY INDUSTRIES | PETRONAS | 2015 |
TURAROUND PSR 2 | PWHT TEAM SUPPLY 5 TEAMS | DIALOG PLANT SERVICE SDN BHD | PETRONAS | 2016 |
NEW VESSEL | PWHT | ENCO SYSTEMS SDN BHD | RAWANG | 2016 |
MANJUNG 5 COAL FIRE 1X1000MW | 23,000 DIA INCH(FIELD WORK) PREHEATING & PWHT | EQUATOR ENF. SDN BHD | TNB MANJUNG | 2016 |
TGAST PROJECT | PWHT 31,000 DIA INCH WORKSHOP & FIELD | EVERSENDAI OIL & GAS SDN BHD | PETRONAS TERENGGANU | 2016 |
SHELL PLATE | 100 PCS FURNACE HEAT | ICE PETROLEUM ENG. SDN BHD | PETRONAS PENGERANG JOHOR | 2016 |
POST CURING AND CLEANING | PWHT | DIALOG PACIFIC ADVANCE COMPOSITES SDN BHD | NILAI NEGERI SEMBILAN | 2016 |
RAID TOYO 62” ABOVE PIPE | PREHEATING & PWHT & HARDNESS TEST (EST. 18,000 DIA INCH) | DIALOG FABRICATION SDN BHD | PETRONAS PENGERANG JOHOR | 2017 |
PCP PENGERANG COGENERATION PLANT PROJECT | PWHT & PREHEATING & HARDNESS TEST (TURBINE) | IAQ SOLUTION SDN BHD | PETRONAS PENGERANG JOHOR | 2018 |
PCP PENGERANG COGENERATION PLANT PROJECT | PWHT & PREHEATING & HARDNESS TEST (EST. 31,000 DIA INCH BOILER) | EQUATOR ENGINEERING SDN BHD | PETRONAS PENGERANG JOHOR | 2018 |
PROVISION OF EPCC DELTA VALUE TUB AT DCU COKE DRUM | PREHEATING & PWHT | DIALOG PLANT SERVIES SDN BHD | MELAKA | 2017 |
TERENGGANU GAS TERMINAL PROJECT | 49,929 DIA INCH | EVERSENDAI OIL AND GAS SDN BHD | KERTEH TERENGGANU | 2016 |
PLANT CHANGE WORK | PREHEATING, PWHT & HARDNESS TEST | KPG ENGINEERING SDN BHD | MLNG BINTULU | 2017 |
RAPID PROJECT | 5,000 DIA INCH PWHT & HARDNESS TEST | DIALOG FABRICATOR SDN BHD | PENGARANG JOHOR | 2017 |
RAPID RGT-2 TERMINAL PROJECT | PREHEATING & PWHT | DIALOG FABRICATOR SDN BHD | PENGARANG JOHOR | 2017 |
MRU PROJECT | PWHT | DIALOG FABRICATOR SDN BHD | PENGARANG JOHOR | 2016 |
MANJUNG 5 POWER PLANT | PREHEATING, PWHT & HARDNESS TEST & POST HEATING | EQUATOR ENGINEERING SDN BHD | MANJUNG PERAK | 2016 |
PENGERANG 1220MW COGENERATION PLANT PROJECT | PWHT, PREHEATING & HARDNESS TEST & POST HEATING | EQUATOR ENGINEERING SDN BHD | PENGARANG JOHOR | 2018 |
JIMAH EAST POWER PLANT PROJECT | PREHEATING & PWHT | EQUATOR ENGINEERING SDN BHD | TANJONG SEPAT NEGERI SEMBILAN | 2018 |
TECHICAS REUNIDAS RAPID PACKAGE | PWHT, HARDNESS TEST, PREHEATING & POST HEATING | EQUATOR ENGINEERING SDN BHD | PENGARANG JOHOR | 2018 |
PENGARANG RAPID SCC PROJECT | PWHT & PREHEATING | EQUATOR ENGINEERING SDN BHD | PENGARANG JOHOR | 2018 |
PENGARANG JOHOR | PWHT, PREHEATING & HARDNESS TEST & CONTROLLED BOLTING | MHI ENERGY & ENVIRONMENT (M) SDN BHD | SIPITANG SABAH | 2017 |
PROVISION OF MAIN MECHANICAL WORKS FOR FSR-2 & MG3 TA2015/16 AT PPMSB | PWHT | PETRONAS PENAPISAN MELAKA | MELAKA | 2018 |
RAPID PROJECT (ELECO) | PREHEATING & PWHT | KOSTEC NDT CONSULTANCY SDN BHD | PENGARANG JOHOR | 2017 |
PENGARANG RAPID PROJECT | PWHT | KOSTEC NDT CONSULTANCY SDN BHD | PENGARANG RAPID PROJECT | 2016 |
REPLACE 1” CAUSTIC LINE | PWHT | TOTAL DYNAMIC ENGINEERING SDN BHD | TOTAL DYNAMIC PORT DICKSON WORKSHOP | 2016 |
PACKAGE 5 RAPID PROJECT | PREHEATING & PWHT | SINO PETROCHEMICAL CONSTRUCTION SDN BHD | PENGARANG JOHOR | 2018 |
PACKAGE 14 RAPID PROJECT | PREHEATING, PWHT, POST HEATING & HADNESS TEST | CPP PETROLEUM ENGINEERING (M) SDN BHD | PENGARANG JOHOR | 2018 |
PETRONAS RAPID PROJECT | PREHEATING & PWHT | SINO TCC (M) SDN BHD | PENGARANG JOHOR | 2017 |
PETRONAS RAPID PROJECT | HARDNESS TEST | SINO TCC (M) SDN BHD | PENGARANG JOHOR | 2017 |
PETRONAS RAPID PROJECT | PWHT | SINO TCC (M) SDN BHD | PENGARANG JOHOR | 2018 |
T9 GMS | HYDRAULIC CONTROLLED BOLTING (TORQUE/TENSIONING) | JGC / SYNERLITZ | MLNG | 2015 |
TANK 7 | HYDRAULIC CONTROLLED BOLTING (TORQUE) | TKM / BPMECH | MLNG | 2017 |
PACKAGE 14 | JOINT INTEGRITY TEAM / HYDROTEST | OUI JV | PETRONAS PENGARANG JOHOR | 2020 |
TRACK 4A 1440 MW CCGT POWER PLANT | JOINT INTEGRITY TEAM / HYDROTEST | EQUATOR ENGINEERING SDN BHD | SOUTHERN POWER GENERATION PENGARANG JOHOR | 2020 |
SAMUR PROJECT | HYDRAULIC CONTROLLED BOLTING(TORQUE/TENSIONING), HT, PWHT | MITSUBISHI HEAVY INDUSTRIES LTD. | SABAH | 2019 |
TRAIN9 MRU PROJECT | PWHT | JGC (M) SDN BHD | BINTULU | 2019 |
SMDS SHUTDOWN | PREHEATING & PWHT | PEC (M) SDN BHD | BINTULU | 2019 |
MELAKA SHUTDOWN | PREHEATING, PWHT, POST HEATING & HADNESS TEST | DIALOG PLANT SERVIES SDN BHD | MELAKA | 2019 |
PSR-2 TURNAROUND PLANT CHANGE PROJECT | PREHEATING, PWHT, & HADNESS TEST | DIALOG PLANT SERVIES SDN BHD | MELAKA | 2019 |